The Pochinki – Gryazovets pipeline

Specifications

The pipeline will be about 650 km long with a pipe diameter of 1420 mm and working pressure of 4 MPA.

The pipeline is maintained by Gazprom Transgaz Ukhta (Yaroslavl region) and Gazprom Transgaz Nizhny Novgorod (Nizhny Novgorod region).

23.jpg

24.jpg


Major repairs.

Specifications

Urengoy-Centre 2, pipe diameter – 1420 mm (the section between 2447 km and 2474 km).

The Yamburg Yelets 2 pipeline with a pipe diameter of 1420 mm.

The following major repairs projects have been carried out

The Yamburg Yelets 2 pipeline with a pipe diameter of 1420 mm (the section between 2533.1 km and 2588 km).

The Perm Kazan Gorky 2 pipeline, pipe diameter of 1220 mm (the section between 865 km and 895 km).

The Yamburg - Western border pipeline, a pipe diameter of 1420 mm (the section between 2565 km and  2592 km).

The Yamburg - Tula - 1 pipeline , a pipe diameter of 1420mm (the section between 2445 km and  2519.5 km).

The Urengoy - Uzhgorod pipeline, a pipe diameter of 1420 mm (the section between 2370.8 km and 2468.4 km).

Maintained by Gazprom Transgaz  Nizhny Novgorod.

44.jpg

45.jpg

2011 CJSC Gazprom StroyTEK Salavat