The Sakhalin - Khabarovsk – Vladivostok natural gas transportation system

Specifications

The total length of the pipeline is more than 1,800 km. The pipeline in its current setup comprises the section between Komsomolsk on Amur and Khabarovsk that is 472 km in length and 700 mm in diameter.

Maintained by Gazprom Transgaz Tomsk.

10.jpg

11.jpg

12.jpg


The Sobolevo - Petropavlovsk-Kamchatsky natural gas pipeline

Specifications

The pipeline is 392 km long and has an annual capacity of up to 750 million cubic meters of natural gas per year.

Maintained by Gazprom Transgaz Tomsk.

14.jpg

15.jpg


The BTK Kirinskoye GCM-GCS Sakhalin pipeline

(Onshore Processing Facility (OPF) Kirinsky gas condensate field (GCF) - the main compressor station (GCS), Sakhalin Island ).

Specifications

The total length of the pipeline, is 136.7 km.

Pipe diameter - 1020 mm, pressure - 9.8 MPa, design capacity - 4.25 billion cubic meters of natural gas  per year.

Kirinskoye field

The Kirinskoye GCF is located on the shelf of Sakhalin Island ( the Okhotsk Sea), 28 km from shore (water depth  of 90 meters). The field was discovered in 1992.

29.jpg

30.jpg

2011 CJSC Gazprom StroyTEK Salavat

6, Prospekt Vernadskogo, Moscow,
Business Centre Capitol.

Location map and detailed information

 The content and design of the website includes materials from gazprom.ru